Hong Kong server colocation  
 
colocation


Dedicated server hosting & colocation
Facilities
Colocation
Unix/Linux
Dedicated server
Email Solutions

server colocation

Call us at 852+29601298 for more information

 

 

 

 


 

 

 

 


Data center facilities

Etek consultant offers direct fibre optics connections, maximum Data Centre security, and a monitored, 24-hour-a-day operating system.

These features insure that all client servers will operate at maximum speed, receiving and transmitting flawless information.
Distribution of Diyixian Internet Centres
Data Centres across the Greater China region. These state-of-the-art IDCs offer businesses direct access to a world class nationwide IP network.

Maximum bandwidth flexibility along with new levels of performance, reliability and scalability for their mission-critical Web hosting, managed services and Internet connection needs.

Rack in iAdvantage Internet Service Center
iAdvantage Network Operation Center
iAdvantage Uninterruptible Power Supply
iAdvantage JUMBO data center

Location: 148 Yeung Uk Road,
Tsuen Wan

Total floor area: 13,800 GFA (150,000 sq.ft.)
Typical floor: 1968 x 7 storeys
No. of storey: 7 storeys + Ground Floor
Floor to floor height: G/F : 4.7m (3.8m under beam)
1/F : 4.25m (3.3m under beam)
Typical floor : 3.5m (2.6m under beam)
Floor loading : 7.5 kPa


Air-conditioning

Central air conditioning for office area and UPS room
Direct expansion type CRAC unit for Internet Service Center

Telecommunications

Dual TBE rooms
Dedicated multi-circuit 100mm dia.
Cable basket for interfloor cabling use
Building Management System

Building control room for monitoring of all engineering systems which includes:
Water leakage alarm
Intrusion alarm
FM 200 alarm and discharge monitor
CRAC unit
Visual capture provision for CCTV installation

Utility Connection

11kV power supply from 2 separate CLP zone substations
Telephone & data connection from 2 separate TBE rooms

Electricity Supply

Mains Supply: Total 1300KVA per floor
UPS: 600KVA per floor and 30 mins battery
EPS: 1200KVA per floor
Earthing: Separate data centre clean earth

Fire Services

FM 200 Fire Suppression System
AFA for office area
FH/HR to HKFSD requirement
VESDA for Internet Service Center


Please contact us for more details.

HK

Etek Consultant 2003, All Rights Reserved